Project Name : MENICON Factory at Kulim Phase 1
This is your Project description has high requirement from client that sandwich panel need to be water tight, insect proof , each details has to discuss with main-contractor team to ensure the workmanship and quality.
​
Total Area : 13,000m2
Project Name : INIFINEON Factory Kulim Phase 1
This project has very high expectation from the consultant side that need to achieve very short time frame and yet we need to control the wastage of panel due to sandwich panel import from oversea.
​
Total Area: 25,000m2
Project Name : AT&S Kulim
Fast track project have to complete within short period of time with high requirement of safety.
​
Total Area : 2,600m2
Project Name : KL118 Kuala Lumpur
A complex and multiple penetration of mechanical and electrical services in large opening.
​
With the right products, it achieve 2 hour fire-rated as per specification and Bomba requirement.
Project Name : Merdeka Boulevard
Tapered shape of curtain wall joint requires to have 2 hour fire-rated product to comply Bomba requirement.
​
Roller shutter with large curve shape opening require to seal up with 2 hour fire-rated firestop products.
Project Name : St. Mary Residence at Kuala Lumpur.
Inspect and reinstall new firestop for M&E services.
​
Extra precaution marking for the opening area to prevent damages or human fall down.